Bran Sands Biomethane GEU HAZOP (1755)
Formal Process Safety Assessments
Northumbrian Water
Bran Sands
20 Feb 2019
-
Ongoing
QEM Solutions were asked to provide technical consultancy in the form of HAZOP Chairing and management for Northumbrian Water Limited (NWL) with the Bran Sands Biomethane GEU Project for Northern Gas Networks (NGN).
The support consisted of a Consultant Engineer Chairing a HAZOP study in Darlington, at the NWL Broken Scar Water Treatment Plant.
QEM provided a suitable Consultant in the form of a competent person with extensive gas network experience, with the QEM Solutions back-up to support.
QEM was responsible for assisting with the following activities:
-
Chair of HAZOP Safety Study Meetings
-
Production of HAZOP Actions
-
Chasing of outstanding HAZOP Action Responses
-
Review and Acceptance of HAZOP Action Responses
-
Production of HAZOP Study Reports